TitleProduct

Pelton Water Turbine Generator

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2019-11-26 02:08

  • Browse the number:

    368

Send an inquiries

Company Profile

Hongya Power Generating Equipment to Utilities Limited

By certification [File Integrity]

Contact:hongyalida(Mr.)  

Email:

Telephone:

Phone:

Area:Beijing

Address:Beijing

Website:http://www.chinawaterturbine.com/ http://hongyalida.luxianguan.com/

PRODUCT DETAILS

Hongya Hydro power is a leading supplier of Hydro Turbine Generator in China, It is always our best endeavor to supply the right part at the right time at the right cost. Our expertise and our latest micro hydro power technology are based on the experience of 17 years in the production of micro hydro power turbine generators and hydroelectric generator.

 

Several different types of water turbines can be used in microhydro installations, selection depending on the head of water, the volume of flow, and such factors as availability of local maintenance and transport of equipment to the site. For mountainous regions where a waterfall of 50 meters or more may be available, a Pelton wheel can be used. For low head installations, Francis or propeller-type turbines are used. Very low head installations of only a few meters may use propeller-type turbines in a pit. The very smallest microhydro installations may successfully use industrial centrifugal pumps, run in reverse as prime movers; while the efficiency may not be as high as a purpose-built runner, the relatively low cost makes the projects economically feasible.


 Introduction

Pelton water turbine generator

Power up to 10MW

Head up to 1000M

Runner size up to 3.2M

Shaft type vertical/ horizontal

Runner material stainless steel

 

Advantages

Efficient customized solutions

Experienced welders and machinists

Reduced outage time and longer-running machines

Significantly reduce outage downtime

Prolong the life of turbine and generator components

Restore components to meet OEM standards

Ensure environment friendly repairs

 

Payment terms ,Delivery and Service

Payment: All the payment can be negotiated, generally by T/T or L/C.

Delivery:10-120 days after receipt of down payment,

Service: 24 hours online service, technical overseas service


FAQ

Q1, what is the term of packing?

packed in new wooden cases suitable for ocean transportation.

Q2,how about delivery time?

6 months after confirm technical specification

Q3, how about payment term?

T/T and L/C


http://www.chinawaterturbine.com/